By Groupe Module 29 November 2016
The team of Groupe Module is proud to announce two (2) new projects ready to start a couple of weeks before the Winter Holidays:
- The transformation of an existing triplex, located at 300 Saint-Joseph East (on Le Plateau) into 6 modern apartments on 3 storeys, and ;
- The redevelopment of suite 207 located at 5800 Saint-Denis, Montreal, for the Société de Transport de Montréal (STM), tenant of the future office once renovated.

Front facade of 300 Saint-Joseph East, Montreal – Before the beginning of the transformation works

Lateral right facade of 300 Saint-Joseph East, Montreal

A portion of suite 207 at 5800 Saint-Denis, Montreal, occupied by a tenant before the beginning of the redevelopment works

The other portion of suite 207 at 5800 Saint-Denis, unoccupied before the beginning of the renovation works