News

Vibrant Colors in Building B at Contrecoeur

Lately, we can see new colors in Building B at Contrecoeur Coopérative de Solidarité Fusion Verte. The paint and flooring works with vibrant colors in public areas and the beginning of landscaping works give life to this new building.

At the same occasion, we can observe a major progression with the exterior envelope work on Buildings C1 and C2.

As for Building A, the masonry and metal siding works continue.

Building A :

DSC02153

Building B :

DSC02112

DSC02131

DSC02177

DSC02199

DSC02190

Buildings C1 and C2 :

DSC02158

DSC02114

DSC02126

DSC02214


New Projects for Summer 2016

Groupe Module Construction Inc. is pleased to announce 3 of their new projects that should start on the week of June 20th, 2016 and continue in the upcoming months:

  1. The refection Marie de France International College‘s roof-terrace located at 4635 Queen Mary road, in Montréal ;
  2. The 2nd phase of the renovations at Club Sportif MAA located at 2070 Peel street, in the heart of downtown Montréal ;
  3. The renovations of the St. George’s High School‘s Fitness Center located at 3100 The Boulevard, in Westmount (Montréal).

Follow us regularly in the next couple of months to know more about the progression of these 3 projects !

DSC00227

Marie de France International College – Refection of the roof-terrace

2016-05-23 18.18.21

Club Sportif MAA (Phase 2) – Coat room to be renovated, part of the works scheduled for phase 2

DSCF3191

St. George’s High School – Renovaions of the Fitness Center


Groupe Module Construction’s Corporate Video

Following its unveiling at the Gala du Président 2016 of APECQ, we are now presenting you our corporate video (French version) proudly showcasing the team of Groupe Module Construction Inc.

Enjoy the viewing !


Work Progression at 3630 Chemin de Chambly, Longueuil

Here are a few pictures showing the recent work progression at 3630 chemin de Chambly in Longueuil.

2016-05-20 13.15.37

2016-05-20 13.16.24

2016-05-27 08.53.38

2016-05-24 11.17.27

2016-06-01 05.09.15

2016-06-06 06.16.17


Latest Updates at Contrecoeur Coopérative de Solidarité Fusion Verte

Lately, we observed that the work at the site of Contrecoeur Coopérative de Solidarité have largely progressed.

The exterior envelope of building B is completed. Gypsum partitions, kitchen cabinets, bathroom vanities and some floor finishes have also been installed as shown in the pictures here below.

As for C1 and C2 buildings, we can assist the beginning of the exterior metal siding and interior systems installations.

Building “A”:

DSC01962

DSC01966

Building “B”:

DSC02051

DSC01994

DSC02001

DSC01980

DSC02016

Buildings “C1” and “C2” :

DSC02053

DSC02039

DSC01947

DSC02012


Updates of the Works on Site at 3630 de Chambly Road, Longueuil

Works on the exterior envelope of the building located at 3630 de Chambly road, in Longueuil, continue.

Here are some pictures of what happened lately on site:

2016-03-16 15.32.30

2016-03-21 08.37.27

20160323_144250_resized

2016-04-19 13.38.05

2016-04-21 11.35.58


General Contractor of the Year at the Gala du Président 2016 of APECQ

On May 13th, 2016, was held the prestigious annual gala of the Association Patronale des Entreprises en Construction du Québec (APECQ) at the reception hall Le Madison, in St. Leonard, with nearly 500 guests.

For the first time in 120 years, three companies instead of one were crowned Business of the Year.

Selected for its distinction in the construction field as well as its determination and performance, leadership, creativity and innovation, not to mention its success in business,  Groupe Module Construction Inc. was crowned general contractor of the year in Greater Montreal.

Me Ali T. Argun, partner at Morency, law firm, presented APECQ’s prize of excellence toMr. Fouad Geara, President of Groupe Module Construction Inc.

The two other awards were presented to Toiture Couture, specialized contractor of the year, and Lefebvre et Benoît, manufacturer and supplier of the year.

001

Gala du Président 2016 Awards to Groupe Module Construction Inc.  –  [Left to right]  Me Ali T. Argun (Partner at Morency), Daniel Barbeau (General Director of APECQ), Fouad Geara (President of Groupe Module Construction Inc.), Marco Santoriello (President of APECQ)   

002

Group photo at Gala du Président 2016  –  [Left to right]  Daniel Barbeau (General Director of APECQ), Marco Santoriello (President of APECQ), Fouad Geara (President of Groupe Module Construction Inc.), Alexandre Lefebvre (Lefebvre et Benoît), Maryse Couture (Toiture Couture), Caroline Lefebvre, André Lefebvre, Marc-André Lefebvre, Laurent Couture, Alberto Bernardi and Guido Di Zazz


You can visit APECQ’s official Website (in French only) to learn more about the gala!


Continuation of the Work Progress at Contrecoeur

Since the last update on buildings A, B , C1 and C2 of Contrecoeur Coopérative de Solidarité Fusion Verte, we could observe a major progression in insulation, exterior siding (masonry and metal siding), interior systems , floor finishes and even kitchen cabinets and bathroom vanities.

Here is a preview in pictures of each of the buildings:

Building “A”

DSC01908

DSC01895

DSC01899

Building “B”

DSC01936

 

DSC01887

 

DSC01920

DSC01881

Buildings “C1” and “C2”

DSC01938

DSC01926


“No Challenge is an Ordeal to the Team of Groupe Module”

The magazine Industrie & Commerce, for their February/March 2016 edition, talks about Groupe Module Construction and the nominations and prize won at the last edition of the Marcus Vitruve Gala from page 69 to 71. Here is a preview of the article:

69a71  Groupe Module EPREUVE FINALE2_Page_1

69a71  Groupe Module EPREUVE FINALE2_Page_2

69a71  Groupe Module EPREUVE FINALE2_Page_3


Work Progress on Buildings A, B, C1 and C2 of Contrecoeur

Here are pictures showing the work progress on site of buildings A, B, C1 and C2 at Contrecoeur Coopérative de Solidarité Fusion Verte during the last couple of weeks.

Building A :

DSC01829

Application of sprayed urethane

DSC01836

Application of sprayed urethane

DSC01741

Interior system works

DSC01861

 

Building B :

DSC01792

Insulation works

DSC01794

Interior system works

DSC01719

Gypsum boards are installed

DSC01720

Gypsum boards are installed

DSC01730

Installation of metal siding

 

DSC01767

Installation of metal siding

 

Buildings C1 and C2 :

DSC01725

Structural works on building C2

DSC01780

Wood structure of buildings C1 and C2

DSC01732

DSC01837 - Copy

Windows installation on buildings C